What We Do

Services

The full list of asphalt work we handle, from new paving to patch repairs.

Home › Services

Everything we take on

Every job below is one we do ourselves across Valley Stream.

Asphalt Paving

We excavate the old surface, compact a stone base and lay hot mix asphalt in binder and surface courses. Most residential driveways run 2 to 3 inches of compacted asphalt over 4 to 6 inches of base, more for anything carrying truck traffic.

Asphalt Driveway Installation

A new driveway starts with grading the subgrade so water pitches away from the garage and foundation. We tack coat between layers so the binder and surface courses actually bond instead of separating under a tire.

Asphalt Sealcoating

Sealcoating fills the small surface pores that let water and gas soak in, and keeps the sun from drying the asphalt out and turning it gray and brittle. Plan on it every two to three years, sooner if the driveway sees a lot of oil drips or road salt.

Asphalt Crack Repair

Hairline cracks let water into the base, and water under asphalt is what turns a crack into a pothole by spring. We rout the crack, clean it out and fill it with hot rubberized sealant that flexes instead of snapping again next winter.

Pothole Repair

A pothole means the base underneath has already failed, so a surface patch alone won't hold. We cut out the bad section, rebuild the base and compact new asphalt in so it doesn't sink again in the same spot.

Asphalt Resurfacing

When a driveway or lot is cracked across most of its surface but the base is still sound, we mill off the top layer and overlay with new asphalt instead of tearing out everything down to dirt. It's a cheaper fix than a full tear-out when the subgrade is still doing its job.

Parking Lot Paving

Commercial lots need a thicker asphalt section than a driveway because of the weight and turning stress from trucks and delivery vans. We grade for drainage to the catch basins and lay the lot out so water doesn't pool at the low corners.

Asphalt Milling

Milling grinds off the top layer of old asphalt without disturbing a sound base underneath. It's how we prep a lot for resurfacing, and it also fixes a driveway sitting too high against a garage threshold or sidewalk.

Line Striping

Parking lot striping for spaces, fire lanes and ADA-compliant accessible spots, painted once the new asphalt has cured enough to hold the line. We lay it out to the dimensions your lot actually requires, not a generic template.

Asphalt Driveway Repair

Not every damaged driveway needs a full repave. If the base is solid under most of it, we can patch failed sections, fix the edges where grass is breaking into the asphalt and reseal the rest.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Valley Stream, NY

Paving and repair work covers these towns and the area around them.

Valley Stream, NY
Hempstead, NY
Freeport, NY
Elmont, NY
Long Beach, NY
Baldwin, NY
Oceanside, NY
Franklin Square, NY
Rockville Centre, NY
Lynbrook, NY
West Hempstead, NY
Common Questions

Things worth asking

Questions that come up once a paving project is underway.

Do I need a permit to repave my driveway?
Most residential driveway repaving doesn't require a permit, but altering the size, adding a new curb cut, or paving a commercial lot usually does need local approval. Checking with the local building department before work starts avoids a problem at inspection time.
How long does it take to pave a driveway?
A standard residential driveway usually takes one to two days: one for excavation and base work, another for laying and compacting the asphalt. Larger commercial lots take longer depending on square footage and whether milling is involved.
Can the job be scoped to fit a budget?
Resurfacing over a sound base instead of a full tear-out, or phasing a large lot in sections, can bring the cost down without skipping the parts that actually affect how long the asphalt lasts. A contractor should be able to walk through those tradeoffs at the estimate stage.
Do you guarantee the paving work?
Workmanship is covered by a written warranty period specified in the estimate, separate from any manufacturer warranty on the asphalt material itself. Sealcoating and crack filling typically carry a shorter coverage period than new paving since they're maintenance items.
Who do I deal with once the job is underway?
The same crew that measured the site and wrote the estimate runs the job, so questions during the work go to someone who already walked the property, not a separate office contact.
What asphalt mix gets used?
Standard hot mix asphalt works for most residential driveways, while commercial lots and anything carrying heavier vehicles get a denser, higher-strength mix and a thicker base. The right mix depends on the traffic the surface must carry.
Can I still park at home while the driveway is being paved?
No, newly laid asphalt needs to cure before it can hold the weight of a car, typically 24 to 72 hours depending on temperature and mix. Arranging street parking or a neighbor's driveway for a few days is worth planning ahead.
How should I prepare the site before paving starts?
Clearing cars, trash cans and anything stored on the driveway or lot gives the crew full access for excavation equipment. Low-hanging branches or sprinkler heads near the edge of the work area are worth pointing out before the job starts.
What if a problem turns up with the base once work has started?
Soft spots, old tree roots or buried debris sometimes show up once excavation starts, and those get addressed before any asphalt goes down since paving over an unstable base just fails again within a year or two. Any extra work gets explained and priced before proceeding.
How do I take care of new asphalt?
Keep vehicles off it for the first few days while it cures, avoid sharp turns that can scuff a fresh surface, and have it sealcoated after about a year once the oils in the asphalt have had time to cure out. After that, sealcoating every two to three years and prompt crack filling keep water from getting into the base.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (929) 389-0746